Visualize the time required at each work step
Issue
Inventory of work-in-progress accumulates as the work speed of the front processes in the production line is fast and is delivered before assembly is done by the operator, resulting in low productivity of the entire line.
Proposal
By using LA6-POE, the retention time of work-in-process inventory can be visualized and the mirroring function can be used to notify the supervisor